Civil Engineering MCQAE Level Civil Engineering
If concrete quantity is 5 m³ and rate is Rs. 5000/m³, amount is
Construction ManagementPYQ/PYQ-PatternMEDIUM
Choose the correct answer
A
Rs. 12500
B
Rs. 25000
C
Rs. 50000
D
Rs. 5005
Correct Answer
B. Rs. 25000
Why is this the answer?
Bill of quantities amount = measured quantity x unit rate (Rs.). In building estimation, cost = measured volume/area x analysis-of-rates unit cost. The abstract of cost aggregates all item amounts to give project total cost. Add GST and contractor overhead/profit to arrive at the contract (tender) value. Amount=quantity×rate=5×5000=Rs. 25000.
Related Construction Management MCQs
More solved Construction Management questions for AE/JE Civil Engineering exams.
- An activity has normal duration 10 days, normal cost Rs.8,000, crash duration 7 days...
- Which of the following is issued AFTER a contract is awarded and is NOT a tender document?
- In a lump sum contract, cost overruns due to unforeseen site conditions are borne by:
- A concrete batching plant produces 0.5 m³ per batch with a cycle time of 3 minutes....
- A brick wall is 5 m long, 4 m high and 0.35 m thick. Quantity of brick masonry is
- One face of a wall 5 m by 3 m is to be plastered. Plastering area is
Practice more Civil Engineering questions
This MCQ belongs to AE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.