Civil Engineering MCQJE Level Civil Engineering

If 1 bag cement occupies 0.0347 cubic metre, cement bags for 0.071 cubic metre cement are approximately:

Estimation and CostingEstimating, Costing and Construction ManagementHARD

Choose the correct answer

A

0.50 bags

B

1.05 bags

C

2.05 bags

D

3.50 bags

Correct Answer

C. 2.05 bags

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Number of bags = 0.071/0.0347, about 2.05.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account