Civil Engineering MCQJE Level Civil Engineering
Normal tension of a tape is the pull at which pull correction numerically equals:
SurveyingSurveying and GeomaticsHARD
Choose the correct answer
A
Sea-level correction
B
Sag correction
C
Slope correction
D
Temperature correction
Correct Answer
B. Sag correction
Why is this the answer?
At normal tension, elongation correction balances sag correction.
Related Surveying MCQs
More solved Surveying questions for AE/JE Civil Engineering exams.
- A 'Digital Elevation Model' (DEM) is used in GIS for:
- 'Contour interval' selection for a topographic survey depends on:
- The 'photogrammetric control' (ground control points) in aerial survey are required for:
- The 'EDM' (Electronic Distance Measurement) instrument measures distances using:
- The 'photogrammetric stereomodel' from two overlapping aerial photos allows...
- The 'corrections' applied to measured chain/tape lengths include all EXCEPT:
Practice more Civil Engineering questions
This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.