Civil Engineering MCQJE Level Civil Engineering

Lehmann's method in plane table work is a trial approach for solving the:

SurveyingSurveying and GeomaticsHARD

Choose the correct answer

A

Three-point problem

B

Two-peg test

C

Reciprocal levelling error

D

Prismoidal correction

Correct Answer

A. Three-point problem

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

It iteratively fixes the station position using three known plotted points.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account