Civil Engineering MCQJE Level Civil Engineering
A change point in levelling is a point where:
SurveyingSurveying and GeomaticsEASY
Choose the correct answer
A
Only intermediate sight is taken
B
Both foresight and backsight are taken
C
Instrument is never shifted
D
RL is assumed zero
Correct Answer
B. Both foresight and backsight are taken
Why is this the answer?
Change point transfers RL from one instrument setup to the next.
Related Surveying MCQs
More solved Surveying questions for AE/JE Civil Engineering exams.
- A 'Digital Elevation Model' (DEM) is used in GIS for:
- 'Contour interval' selection for a topographic survey depends on:
- The 'photogrammetric control' (ground control points) in aerial survey are required for:
- The 'EDM' (Electronic Distance Measurement) instrument measures distances using:
- The 'photogrammetric stereomodel' from two overlapping aerial photos allows...
- The 'corrections' applied to measured chain/tape lengths include all EXCEPT:
Practice more Civil Engineering questions
This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.