The Weibull plotting position formula assigns a probability P to the m-th ranked value (ascending order) in a data series of N values as:
HydrologyWeibull Plotting PositionMEDIUM
Choose the correct answer
A
P = m / N
B
P = m / (N + 1)
C
P = (m - 0.375) / (N + 0.25)
D
P = (m - 0.5) / N
Correct Answer
B. P = m / (N + 1)
Why is this the answer?
Weibull: P = m/(N+1), where m = rank (1 = smallest). Return period T = 1/P = (N+1)/m. Weibull is unbiased estimator of exceedance probability. Other formulas: Hazen P = (m-0.5)/N; Blom (Gringorten) P = (m-0.44)/(N+0.12) (better for extreme value distributions).
Related Hydrology MCQs
More solved Hydrology questions for AE/JE Civil Engineering exams.
- The 'SCS Curve Number' (CN) method for estimating runoff uses CN values that depend on:
- The 'design storm' for urban drainage uses IDF (Intensity-Duration-Frequency) curves...
- If the coefficient of variation of the rainfall values of the existing rain-gauge...
- If base period is 150 days and delta is 0.6 m, duty is
- For base period 120 days and duty 600 ha/cumec, delta is
- Darcy's law for groundwater flow states that the discharge velocity (Darcy flux) v...
Practice more Civil Engineering questions
This MCQ belongs to AE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.