If base period is 150 days and delta is 0.6 m, duty is

HydrologyOriginal practiceMEDIUM

Choose the correct answer

A

10.42 ha/cumec

B

4320 ha/cumec

C

1080 ha/cumec

D

2160 ha/cumec

Correct Answer

D. 2160 ha/cumec

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

In irrigation engineering, Duty (D) = 8.64 × B / Δ, where B is base period (days) and Δ is delta (m of water depth). B = 150 days, Δ = 0.6 m. D = 8.64 × 150 / 0.6 = 2160 ha/cumec ha/cumec. Duty means the area (hectares) that 1 cumec of water can irrigate throughout the base period.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to AE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account