Civil Engineering MCQAE Level Civil Engineering

If base period is 150 days and delta is 0.6 m, duty is

HydrologyOriginal practiceMEDIUM

Choose the correct answer

A

10.42 ha/cumec

B

4320 ha/cumec

C

1080 ha/cumec

D

2160 ha/cumec

Correct Answer

D. 2160 ha/cumec

Why is this the answer?

In irrigation engineering, Duty (D) = 8.64 × B / Δ, where B is base period (days) and Δ is delta (m of water depth). B = 150 days, Δ = 0.6 m. D = 8.64 × 150 / 0.6 = 2160 ha/cumec ha/cumec. Duty means the area (hectares) that 1 cumec of water can irrigate throughout the base period.

Related Hydrology MCQs

More solved Hydrology questions for AE/JE Civil Engineering exams.

View all Hydrology MCQs →

Practice more Civil Engineering questions

This MCQ belongs to AE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account