The total rainfall in a catchment of area 1200 km^2 during a 6 h storm is 160 mm. If the total runoff is 600 hectare-meters, the infiltration index (phi-index) is:
HydrologyHydrologyMEDIUM
Choose the correct answer
A
1 cm/h
B
0.10 cm/h
C
10 cm/h
D
0.01 cm/h
Correct Answer
A. 1 cm/h
Why is this the answer?
Total rainfall = 160 mm = 16 cm. Runoff = 600 ha-m = 6,000,000 m^3. Area = 1200 km^2 = 120,000 ha. Runoff depth = (600 ha-m / 120,000 ha) = 0.005 m = 0.5 cm. Total loss = 16 - 0.5 = 15.5 cm. Phi-index = 15.5 cm / 6 h = 2.58 cm/h. Given the original options are likely based on a different runoff value, the question is mathematically incomplete.
Related Hydrology MCQs
More solved Hydrology questions for AE/JE Civil Engineering exams.
- The 'SCS Curve Number' (CN) method for estimating runoff uses CN values that depend on:
- The 'design storm' for urban drainage uses IDF (Intensity-Duration-Frequency) curves...
- If the coefficient of variation of the rainfall values of the existing rain-gauge...
- If base period is 150 days and delta is 0.6 m, duty is
- For base period 120 days and duty 600 ha/cumec, delta is
- Darcy's law for groundwater flow states that the discharge velocity (Darcy flux) v...
Practice more Civil Engineering questions
This MCQ belongs to WBPSC AE Previous Years Questions Series. Full tests include timed attempts, rank comparison and subject-wise analysis.