Civil Engineering MCQJE Level Civil Engineering

The stress block in LSM uses 0.36 fck xu for concrete compressive force in rectangular section.

RCCRCC and Steel DesignMEDIUM

Choose the correct answer

A

0.87 fy Ast

B

0.36 fck b xu

C

fck bd

D

0.446 fck b d

Correct Answer

B. 0.36 fck b xu

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Concrete compression in LSM rectangular stress block is 0.36 fck b xu.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to RRB JE Civil & Allied Engineering CBT-2 Full Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account