Civil Engineering MCQAE Level Civil Engineering

A circular sewer of diameter 0.5 m runs full at velocity 0.6 m/s. Discharge is nearly

Environmental EngineeringOriginal practiceMEDIUM

Choose the correct answer

A

0.236 m³/s

B

0.118 m³/s

C

0.300 m³/s

D

0.059 m³/s

Correct Answer

B. 0.118 m³/s

Why is this the answer?

Discharge in a circular sewer running full: Q = A × V = (π D² / 4) × V. D = 0.5 m, V = 0.6 m/s. Q = π × 0.5² / 4 × 0.6 = 0.118 m³/s m³/s. For a sewer running full, the cross-sectional area equals π D²/4. Self-cleansing velocity is typically ≥ 0.6 m/s to prevent silt deposition.

Related Environmental Engineering MCQs

More solved Environmental Engineering questions for AE/JE Civil Engineering exams.

View all Environmental Engineering MCQs →

Practice more Civil Engineering questions

This MCQ belongs to AE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account