Civil Engineering MCQJE Level Civil Engineering
A candidate is comparing options for Development Length. Which line correctly handles anchorage of reinforcing bars? Avoid the common trap that it is the clear cover to the bar.
RCCDevelopment LengthEASY
Choose the correct answer
A
it equals stirrup spacing
B
it is the clear cover to the bar
C
it is the unsupported length of column
D
it is the embedment length needed to develop design stress in the bar
Correct Answer
D. it is the embedment length needed to develop design stress in the bar
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
Development length ensures bond transfer from steel to concrete. Correct option: D.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap
Practice more Civil Engineering questions
This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.