Civil Engineering MCQAE Level Civil Engineering

Why is the curing period of concrete made with PPC more than that with OPC?

Building MaterialsBuilding MaterialsMEDIUM

Choose the correct answer

A

In PPC the secondary (pozzolanic) reaction starts after hydration

B

In PPC primary hydration starts at a later stage after adding water

C

In PPC the cement particles are coarser than OPC

D

In PPC gypsum addition is more than OPC

Correct Answer

A. In PPC the secondary (pozzolanic) reaction starts after hydration

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

The pozzolanic reaction consumes the lime liberated during hydration and proceeds slowly after primary hydration, needing longer curing.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to WBPSC AE Previous Years Questions Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account