Vee-bee time for low workability as per IS standard is

Building MaterialsBuilding MaterialsMEDIUM

Choose the correct answer

A

2-5 seconds

B

5-10 seconds

C

10-15 seconds

D

15-20 seconds

Correct Answer

B. 5-10 seconds

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

As per IS workability ranges, low workability corresponds approximately to a Vee-Bee time of 5-10 seconds