Civil Engineering MCQJE Level Civil Engineering
Time of concentration is the time taken by runoff from:
HydrologyHydrology and Irrigation EngineeringMEDIUM
Choose the correct answer
A
Nearest point to evaporate
B
Farthest point of catchment to reach outlet
C
Canal head to tail only
D
Reservoir bottom to crest
Correct Answer
B. Farthest point of catchment to reach outlet
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
It controls peak runoff and hydrograph shape.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap
Practice more Civil Engineering questions
This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.