The 'watershed boundary' delineated from a DEM is based on the principle that:

SurveyingSurveyingMEDIUM

Choose the correct answer

A

Soil type determines catchment boundary

B

Flow direction from DEM (water flows to lowest neighbour) — boundary = ridge where flow direction diverges to different outlets

C

Administrative boundary

D

Rainfall determines watershed area

Correct Answer

B. Flow direction from DEM (water flows to lowest neighbour) — boundary = ridge where flow direction diverges to different outlets

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Watershed delineation: D8 flow direction algorithm assigns each cell a flow direction to one of 8 neighbours (lowest adjacent cell). Flow accumulation counts how many cells drain through each cell (high accumulation = stream). Watershed boundary = divide where flow goes to different outlets. GIS software (ArcGIS, QGIS) automates this using DEM. Fill sinks first (remove artefacts).

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to JE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account