Civil Engineering MCQJE Level Civil Engineering
The BOD removal efficiency of a well-operated conventional activated sludge process (ASP) treating domestic sewage is typically:
Environmental EngineeringBiological TreatmentHARD
Choose the correct answer
A
40–55%
B
60–75%
C
75–88%
D
90–95%
Correct Answer
D. 90–95%
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
Activated sludge process achieves 90–95% BOD removal under optimal operating conditions (MLSS 2000–4000 mg/L, F/M ratio 0.2–0.5 day⁻¹, SRT 5–15 days). Trickling filters achieve 75–85%; primary sedimentation alone achieves 25–40%.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap