Civil Engineering MCQAE Level Civil Engineering

The average time required for a batch of water to pass through the settling basin is known as:

Environmental EngineeringEnvironmental EngineeringMEDIUM

Choose the correct answer

A

flow through time

B

batch time

C

detention period

D

mean residence time

Correct Answer

C. detention period

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

In sedimentation basin design, average holding time is called detention period

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to WBPSC AE Previous Years Questions Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account