Civil Engineering MCQJE Level Civil Engineering
The approximate volume of one 50 kg bag of cement is:
Estimation and CostingEstimating, Costing and Construction ManagementEASY
Choose the correct answer
A
0.1000 cubic metre
B
0.0100 cubic metre
C
0.0347 cubic metre
D
0.5000 cubic metre
Correct Answer
C. 0.0347 cubic metre
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
With specific gravity about 3.15, one 50 kg cement bag occupies about 0.0347 cubic metre.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap
Practice more Civil Engineering questions
This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.