Survey camp problem: For crop delta 75 cm and base period 150 days, duty is approximately:
Fluid MechanicsHydraulics, Hydrology and IrrigationHARD
Choose the correct answer
A
1728 ha/cumec
B
17.3 ha/cumec
C
13 ha/cumec
D
432 ha/cumec
Correct Answer
A. 1728 ha/cumec
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
Duty D = 864 B / Delta when Delta is in cm.