Rise and fall method is preferred when:

SurveyingSurveyingHARD

Choose the correct answer

A

instrument is total station only

B

only reduced level of last point is needed

C

all points have same RL

D

arithmetic check and detailed slope changes are important

Correct Answer

D. arithmetic check and detailed slope changes are important

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Rise and fall method gives a complete check on backsights, foresights, rises, falls and RLs.