Civil Engineering MCQCivil Engineering (Shared)
Lost time in signal design includes time lost during:
Transportation EngineeringMEDIUMMEDIUM
Choose the correct answer
A
Starting delay and clearance intervals
B
Free-flow cruise only
C
Road construction curing
D
Parking outside road
Correct Answer
A. Starting delay and clearance intervals
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
Lost time reduces effective green available for discharging vehicles. Reference: IRC:93 signal timing concepts
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap
Practice more Civil Engineering questions
This MCQ belongs to Geometric Design of Highways and Traffic Engineering. Full tests include timed attempts, rank comparison and subject-wise analysis.