Civil Engineering MCQJE Level Civil Engineering
Height of instrument in levelling means:
SurveyingField SurveyingHARD
Choose the correct answer
A
RL of line of collimation
B
difference of two RLs only
C
height of tripod
D
staff reading at BM
Correct Answer
A. RL of line of collimation
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
HI is the reduced level of the instrument line of sight.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap
Practice more Civil Engineering questions
This MCQ belongs to JE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.