Civil Engineering MCQJE Level Civil Engineering

Formwork for RCC beams and slabs is measured in:

Estimation and CostingEstimating, Costing and Construction ManagementEASY

Choose the correct answer

A

Cubic metre of concrete

B

Number of props only

C

Kilogram of steel

D

Square metre of contact surface

Correct Answer

D. Square metre of contact surface

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Formwork is paid for the area in contact with concrete.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap