Civil Engineering MCQAE Level Civil Engineering
Fluming of canal in cross-drainage works means
Irrigation EngineeringIrrigation EngineeringMEDIUM
Choose the correct answer
A
contracting the waterway of canal
B
widening the canal
C
raising canal bed
D
providing drain under canal
Correct Answer
A. contracting the waterway of canal
Why is this the answer?
Fluming reduces/contract the canal section at a structure
Related Irrigation Engineering MCQs
More solved Irrigation Engineering questions for AE/JE Civil Engineering exams.
- The 'Lacey''s regime theory' for design of stable alluvial canals gives:
- In irrigation, if the duty D (hectares per cumec) and delta delta (m) over the base...
- A silty soil of high compressibility is represented by
- Freeboard in a dam is the vertical distance between:
- The field irrigation requirement (FIR) for a crop is related to consumptive use (CU),...
- In canals likely to be water-logged, the preferable type of irrigation is
Practice more Civil Engineering questions
This MCQ belongs to WBPSC AE Previous Years Questions Series. Full tests include timed attempts, rank comparison and subject-wise analysis.