Civil Engineering MCQJE Level Civil Engineering

Engineering estimate: Equilibrium superelevation for speed 80 km/h and radius 200 m is:

Transportation EngineeringTransportation, Railway, Bridge and TunnelHARD

Choose the correct answer

A

0.142

B

0.0018

C

0.252

D

0.011

Correct Answer

A. 0.142

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

For roads, e = V²/(225R) when side friction is zero.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to RRB JE Civil & Allied Engineering CBT-2 Full Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account