Civil Engineering MCQAE Level Civil Engineering
Duty 864 hectares/cumec and base period 120 days give delta
Irrigation EngineeringIrrigation EngineeringMEDIUM
Choose the correct answer
A
30 cm
B
60 cm
C
90 cm
D
120 cm
Correct Answer
D. 120 cm
Why is this the answer?
Delta = 8.64B/D = 8.64x120/864 = 1.2 m = 120 cm
Related Irrigation Engineering MCQs
More solved Irrigation Engineering questions for AE/JE Civil Engineering exams.
- The 'Lacey''s regime theory' for design of stable alluvial canals gives:
- In irrigation, if the duty D (hectares per cumec) and delta delta (m) over the base...
- A silty soil of high compressibility is represented by
- Freeboard in a dam is the vertical distance between:
- The field irrigation requirement (FIR) for a crop is related to consumptive use (CU),...
- In canals likely to be water-logged, the preferable type of irrigation is
Practice more Civil Engineering questions
This MCQ belongs to WBPSC AE Previous Years Questions Series. Full tests include timed attempts, rank comparison and subject-wise analysis.