Cross drainage work is required when canal crosses:
HydrologyIrrigation Engineering and HydrologyHARD
Choose the correct answer
A
building column
B
road sign
C
contour line only
D
natural drain or river
Correct Answer
D. natural drain or river
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
CD works handle intersection of canal and drainage channels.