Civil Engineering MCQCivil Engineering (Shared)

Cover blocks in RCC work are used during reinforcement fixing mainly to maintain:

Concrete Technology & RCCCover SpacersEASY

Choose the correct answer

A

Specified clear cover

B

Concrete slump

C

Bar yield stress

D

Formwork removal time

Correct Answer

A. Specified clear cover

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Cover blocks/spacers keep reinforcement at the required clear cover before and during concreting.