Civil Engineering MCQCivil Engineering (Shared)

Construction joints should preferably be located at:

Concrete Technology & RCCCold jointsMEDIUM

Choose the correct answer

A

Positions of minimum shear and as per structural requirement

B

Points of maximum shear only

C

Random locations

D

Anywhere without preparation

Correct Answer

A. Positions of minimum shear and as per structural requirement

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Construction joints should be planned and treated properly to maintain structural continuity. Reference: Clause 13.4 | Page: verify from your official BIS copy/PDF pagination

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to IS 456:2000 Premium Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account