Civil Engineering MCQJE Level Civil Engineering

Canal regulation is done with cross regulators and:

Irrigation EngineeringHydrology and Irrigation EngineeringMEDIUM

Choose the correct answer

A

Railway sleepers

B

Head regulators

C

Slump cones

D

Triaxial cells

Correct Answer

B. Head regulators

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Regulators control flow and water levels in canal systems.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account