Before removing soffit formwork from flexural members, the key engineering check is that concrete has gained adequate strength to safely resist:

Concrete Technology & RCCFormwork StrikingMEDIUM

Choose the correct answer

A

Self-weight and construction loads

B

Only magnetic declination

C

Only water absorption of bricks

D

Only traffic density

Correct Answer

A. Self-weight and construction loads

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Formwork removal depends on member type, span and concrete strength sufficient for imposed construction stage actions.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to IS 456:2000 Premium Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account