Applied formula case: For nominal concrete estimation, if wet concrete volume is 1 m³, approximate dry volume of ingredients is:

Building MaterialsBuilding, Materials, Concrete, Drawing and CADMEDIUM

Choose the correct answer

A

1 m³

B

1.25 m³

C

1.54 m³

D

2 m³

Correct Answer

C. 1.54 m³

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Dry volume is commonly taken as about 1.54 times wet volume.