Civil Engineering MCQJE Level Civil Engineering
An S-curve hydrograph is obtained by adding unit hydrographs spaced at:
HydrologyHydrology and Irrigation EngineeringHARD
Choose the correct answer
A
Zero time difference
B
Random intervals
C
Unit hydrograph duration intervals
D
One calendar year only
Correct Answer
C. Unit hydrograph duration intervals
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
Continuous addition produces a hydrograph for continuous effective rainfall.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap
Practice more Civil Engineering questions
This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.