Civil Engineering MCQJE Level Civil Engineering

An S-curve hydrograph is obtained by adding unit hydrographs spaced at:

HydrologyHydrology and Irrigation EngineeringHARD

Choose the correct answer

A

Zero time difference

B

Random intervals

C

Unit hydrograph duration intervals

D

One calendar year only

Correct Answer

C. Unit hydrograph duration intervals

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Continuous addition produces a hydrograph for continuous effective rainfall.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to SSC JE Civil Paper-I Technical Mock Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account