Civil Engineering MCQAE Level Civil Engineering

A triangular DRH due to a storm has a time base of 40 h and peak flow of 20 m^3/s occurring at 20 h from start. If catchment area is 14.4 sq. km, rainfall excess is

HydrologyHydrologyMEDIUM

Choose the correct answer

A

5 cm

B

10 cm

C

20 cm

D

14.4 cm

Correct Answer

B. 10 cm

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Runoff volume = 0.5 x 40 x 3600 x 20 = 1.44 million m^3; over 14.4 km^2 this is 0.10 m = 10 cm

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to WBPSC AE Previous Years Questions Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account