A stepped bar has cross-sections 1000 mm² over 1 m and 500 mm² over another 1 m, both carrying 100 kN compressive load (E = 200 GPa). Total shortening is:
Strength of MaterialsStepped Bar DeformationMEDIUM
Choose the correct answer
A
0.75 mm
B
1.0 mm
C
1.5 mm
D
2.0 mm
Correct Answer
C. 1.5 mm
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
δ₁ = 100,000×1000/(1000×200,000) = 0.5 mm; δ₂ = 100,000×1000/(500×200,000) = 1.0 mm; total = 1.5 mm