Civil Engineering MCQAE Level Civil Engineering

A cross-drainage work is required when:

Irrigation EngineeringWater Resources Engineering and IrrigationHARD

Choose the correct answer

A

a road meets a bridge only

B

two contours meet

C

a canal and natural drain cross each other

D

rainfall is zero

Correct Answer

C. a canal and natural drain cross each other

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

Cross-drainage structures carry canal water across drainage or drainage water across canal depending on relative levels.

ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.

Concept shortcut
IS/IRC reference
Common trap

Practice more Civil Engineering questions

This MCQ belongs to AE Level Premium Test Series. Full tests include timed attempts, rank comparison and subject-wise analysis.

Create Free Account