A clay layer drains on both top and bottom. Its drainage path for thickness 8 m is:

Soil MechanicsSoil Mechanics and Foundation EngineeringHARD

Choose the correct answer

A

16 m

B

8 m

C

4 m

D

2 m

Correct Answer

C. 4 m

AI Detailed Explanation & IS Code Reference

Unlock the reasoning, formula path and code-linked notes inside your student dashboard.

For double drainage, maximum drainage path is half the layer thickness.