Civil Engineering MCQJE Level Civil Engineering
A candidate is comparing options for Delta. Which line correctly handles total depth of water required by a crop? Avoid the common trap that delta is seepage velocity.
Irrigation EngineeringDeltaMEDIUM
Choose the correct answer
A
delta is always zero for rice
B
delta is the depth of water over the cropped area during base period
C
delta is canal bed slope
D
delta is seepage velocity
Correct Answer
B. delta is the depth of water over the cropped area during base period
AI Detailed Explanation & IS Code Reference
Unlock the reasoning, formula path and code-linked notes inside your student dashboard.
Delta represents total crop water requirement depth. Correct option: B.
ScoreCardAI links this solution with subject, topic and difficulty signals so your scorecard can identify weak areas after a full mock test.
Concept shortcut
IS/IRC reference
Common trap